Standard Specification

Our standard specification is a complete package. When your house is completed, you will be able to move in. Our specification includes:

  • Architect’s fees
  • Processing and obtaining the building permit
  • Site manager’s services throughout the build
  • The services of our partners in Greece and the UK throughout the build
  • Digging foundations and earth moving
  • Reinforced concrete framework
  • Double walls with insulation
  • Interior and exterior plasterwork
  • Two shower rooms, including all fittings, chosen by client
  • Water storage tank of 15 000 cubic metres
  • Mains water meter
  • Water pump
  • Electricity supply from meter to house
  • Basic interior electric fittings
  • Under floor pipes for central heating
  • Doors, windows and shutters
  • Glazing
  • Woodwork varnished
  • Tiled roof with exposed beams
  • Tiling throughout the house with plaka or ceramic tiles to an agreed price range
  • Interior and exterior white paint finish
  • Trip to Volos to choose necessary fittings (accompanying client or on behalf of client)
  • All VAT
  • All National Insurance contributions

Of course, every project is different, and this specification can be extended to meet your requirements.

Timescales

In Greece, building work takes place between September and early July. Subject to weather conditions, a house usually takes around six months to complete. If you came out in May to choose a plot you could return in June to sign the paperwork and discuss the plans. The plans would be passed in September and building would start in October. The house would be completed in late Spring. You could return at Easter to discuss tiling and furnishing. By July you would be living in your new villa.

Payment

At the building permit stage, we ask for a 15% deposit. 50% of the cost is due as the build starts. 25% is due when the roofing is completed. The final 10% is due on completion.